Project StatusAll ProjectsCompleted(230)On Going(55)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(227)Others(8)Select Years All2025 (46)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct New Bridge for Baietan Avenue (Pearl River Tunnel Section) Liwan District, Guangzhou Using DURA I-beams with length from 24.27m to 27.08m.Year: 2024Status: On GoingCountry: China To Construct New Bridge For Upgrading Road at Jalan Pekan Persiangan – Kg. Lampas – Kg. Sikalabaan Nabawan , Sabah – Bridge 3 Using DURA®IB1000 – 24m.Year: 2025Status: CompletedCountry: Malaysia To Construct New Bridge For Upgrading Road at Jalan Pekan Persiangan – Kg. Lampas – Kg. Sikalabaan Nabawan , Sabah – Bridge 2 Using DURA®IB1000–25mYear: 2025Status: On GoingCountry: Malaysia To Construct New Bridge For Upgrading Road at Jalan Pekan Persiangan – Kg. Lampas – Kg. Sikalabaan Nabawan , Sabah – Bridge 1 Using DURA®UBG2000 – 45m.Year: 2025Status: CompletedCountry: Malaysia To Build New Bridge at Sungai Entabai, Julau, Sarawak using DURA®IB1000-25MYear: 2024Status: CompletedCountry: Malaysia To Replace Old Bridge at Kampung Baru Tanjung Thai (Pedu), Padang Terap, Kedah Using DURA®IB850 – 15m to 20m Long.Year: 2025Status: On GoingCountry: Malaysia To Replace Bridge at FT175/037/72, Sik, Kedah Using DURA®UBG1250 – 36mYear: 2025Status: On GoingCountry: Malaysia To Construct New Bridge for Flood Mitigation Plan at Sungai Buloh , Selangor using DURA®UBG2250 – 50mYear: 2025Status: CompletedCountry: Malaysia To Construct Road Bridge for Kuala Kedah Jetty, Kedah using IB850-22mYear: 2025Status: On GoingCountry: Malaysia To Replace Steel Bridge to Concrete Bridge at Gelang Patah-Pendas Road , Johor Bahru using DURA®UBG1500 – 40mYear: 2025Status: CompletedCountry: Malaysia Previous Page1 … Page3 Page4 Page5 Page6 Page7 … Page29 Next