Project StatusAll ProjectsCompleted(221)On Going(61)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(224)Others(8)Select Years All2025 (43)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct New Bridge for River Corridor Restoration Plan at Sungai Semerting , Bentong , Pahang using DURA®SB350/Integrated Precast UHPFRC BeamYear: 2024Status: CompletedCountry: Malaysia To Build New Utilities Bridge at Anak Endau River , Rompin , Pahang using DURA®IB1200-30m and Precast UHPFRC Deck.Year: 2024Status: CompletedCountry: Malaysia LANING OF EXISTING 2-LANING STRETCH FROM DHARMAPURI AT KM. 117.000 TO LONAND- AT KM. 166.400 (PKG-IV) ON MOHOL-ALANDI SECTION (DESIGN LENGTH 49.400 KM) OF NH-965 IN THE STATE OF MAHARASHTRA ON EPC MODEYear: 2023Status: CompletedCountry: India To Upgrade Bridge at Sungai Sembrong , Batu Pahat , Johor Using DURA®UBG1250-35mYear: 2024Status: CompletedCountry: Malaysia Mumbra Bridge OverlayYear: 2023Status: CompletedCountry: India 4-laning of existing 2-laning stretch from Dharmapuri at km. 117.000 το Lonand- at KM. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of NH-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India 4-Laning of existing 2-laning stretch from Dharmapuri at KM 117.000 to Lonand- at km. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of nh-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India 4-laning of existing 2-laning stretch from Dharmapuri at km. 117.000 to Lonand at km. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of nh-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2024Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC ModeYear: 2024Status: CompletedCountry: India Previous Page1 … Page4 Page5 Page6 Page7 Page8 … Page29 Next