Project StatusAll ProjectsCompleted(240)On Going(55)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(237)Others(8)Select Years All2025 (56)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct UHPC Composite Bridge (2.26 km) Used at Indora Flyover Serving the People in Nagpur, India.Year: 2024Status: On GoingCountry: India To Construct a 200-meter Riverwall with an RC capping beam to Prevent Erosion along Kampung Long Bemang , Sungai Apoh , Miri , Sarawak Using DURA® Prestressed Sheet pile PSP750-18M.Year: 2024Status: On GoingCountry: Malaysia To Construct New Bridge For Jalan Semawang ke Tanjung Kuala Gum Gum , Sandakan , Sabah Using DURA®BBG4000 – 105m and DURA®UBG2000 – 50mYear: 2025Status: On GoingCountry: Malaysia To Construct New Bridge for River Corridor Restoration Plan at Sungai Semerting , Bentong , Pahang using DURA®SB350/Integrated Precast UHPFRC BeamYear: 2024Status: CompletedCountry: Malaysia To Build New Utilities Bridge at Anak Endau River , Rompin , Pahang using DURA®IB1200-30m and Precast UHPFRC Deck.Year: 2024Status: CompletedCountry: Malaysia LANING OF EXISTING 2-LANING STRETCH FROM DHARMAPURI AT KM. 117.000 TO LONAND- AT KM. 166.400 (PKG-IV) ON MOHOL-ALANDI SECTION (DESIGN LENGTH 49.400 KM) OF NH-965 IN THE STATE OF MAHARASHTRA ON EPC MODEYear: 2023Status: CompletedCountry: India To Upgrade Bridge at Sungai Sembrong , Batu Pahat , Johor Using DURA®UBG1250-35mYear: 2024Status: CompletedCountry: Malaysia Mumbra Bridge OverlayYear: 2023Status: CompletedCountry: India 4-laning of existing 2-laning stretch from Dharmapuri at km. 117.000 το Lonand- at KM. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of NH-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India 4-Laning of existing 2-laning stretch from Dharmapuri at KM 117.000 to Lonand- at km. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of nh-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India Previous Page1 … Page5 Page6 Page7 Page8 Page9 … Page30 Next