Project StatusAll ProjectsCompleted(237)On Going(56)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(235)Others(8)Select Years All2025 (54)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC ModeYear: 2024Status: CompletedCountry: India To Replace Old Steel Sheet Pile with New Sheet Pile for Slope Protection at Petaling Jaya Lake , Selangor using DURA®Prestressed Sheet Pile (PSP) 500AYear: 2024Status: CompletedCountry: Malaysia TURBHE ROB [Flyover] – Rehabitation of Turbhe ROB on Sion Panvel highway KM. 129/425 to KM. 130/145 Taluka – Thane, Dist – ThaneYear: 2024Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2023Status: CompletedCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2023Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 (DHARAMPURI 145+902)Year: 2023Status: CompletedCountry: India To Construct Bridge for Kampung Pahat 3 , Daerah Hulu Perak , Gerik , Perak Using DURA®IB650-19mYear: 2023Status: CompletedCountry: Malaysia To Construct New Bridge Kampung Padang Tengah , Petagas , Sabah Using DURA®UBG2500 – 60.5 mYear: 2024Status: CompletedCountry: Malaysia To Construct New Bridge for District and Land Office at Lorong Yusuf Sudin , Kampung Garok , Selama , Perak Using DURA®IB850 – 20mYear: 2024Status: CompletedCountry: Malaysia To Construct New Bridge for District and Land Office at Kampung Air Pulau , Hulu Perak , Gerik , Perak Using DURA®IB650 – 20mYear: 2023Status: CompletedCountry: Malaysia Previous Page1 … Page6 Page7 Page8 Page9 Page10 … Page30 Next