Kerja-Kerja Menaiktaraf Sebuah Jambatan Dan Kerja-Kerja Berkaitan Di Sungai Sembrong, Projek Pertanian Moden, Batu Pahat, Johor
2024
Completed Project
Malaysia
2.004835 N, 103.214027 E
One Span 35m by 8.5m Wide UHPFRC Composite Bridge System
2 pieces of DURA® UBG1250 – 35m
Cast in-situ RC abutments
250mm x 250mm RC Pile
HA+KEL or 30 units HB loadings
Jabatan Pengairan dan Saliran Malaysia (JPS)
Jabatan Pengairan dan Saliran Daerah Batu Pahat
Pancar Delima Resources
12 months