Projek Rancangan Bina Baru Jambatan Sungai Entabai,Julau,Sarawak
2024
On Going Project
Malaysia
1.649509 N, 111.821125 E
Three Spans 25m by 4m Wide UHPFRC Composite Bridge System
2 pieces of DURA® IB1000-11.95 M, 1 piece of DURA® IB1000-25m
Cast in-situ RC abutments
300mm dia. Spun Piles
HA+ 30 units HB loadings
JKR SARAWAK
JKR SARAWAK
Sara Muhibah Sdn Bhd
18 months