
Kerja Membaikpulih Semula Struktur Jambatan I-Beam Yang Runtuh Menyeberangi Sungai Sengkuang Dan Gabion Yang Rosak Ke Jalan Masuk Perkampungan Orang Asli Tumboh Hangat, Mukim Bota, Daerah Perak Tengah, Perak Darul Ridzuan. (Medium Traffic Bridge).
2015
Completed Project
Malaysia
4.313501,100.92444
Single Span 15m long x 4m wide DURA composite bridge
3 pieces of DURA® IB650-15m
2 nos. of cast in-situ RC abutments
200mm square RC piles (JKR Class 1)
HA + KEL loading + 30 Units HB Loadings (BD37/01)
JKR Perak

Jurutera Perunding Concrete Technology
SL Construction
3 months
Completed