Flood Mitigation Plan at Bertam Valley Cameron Highlands, Pahang. Project in Widening & Deepening Bertam River & Other Related Works - Bridge JK 1 & 2.(Rancangan Tebatan Banjir Lembah Bertam Cameron Highlands, Pahang. Project Melebar Dan Mendalamkan Sungai Bertam Dan Kerja-Kerja Berkaitan - Bridge JK 1 & 2). Nos. of Bridges: 2
2015
Completed Project
Malaysia
4.413677,101.402563
Single span 30m long x 5.5m wide DURA U-trough bridge
1 piece of DURA® UTG1500-30.0m per bridge
Cast in-situ RC abutments
300mm dia. Spun pile (Class B)
Combination of HA + KEL & 30 units HB loadings (BD37/01)
JPS Malaysia

JPS Cameron

Jurutera Perunding Concrete Technology (Alternative Design)
Jutabina Sempurna Sdn Bhd / Maltecon Builder Sdn. Bhd.
12 months
Completed