To Construct a Service Bridge at Animation Theme Park, Ipoh.(Projek Cadangan membina 1 unit Bangunan Pintu Masuk satu (1) tingkat, 1 unit TNB substation 11/0.4kV, 6 unit ‘Drop off’’ Berbumbung, unit Pintu Gerbang, 634 unit Tempat Kereta, 92 unit Tempat Letak Motosikal, 16 unit Tempat Letak Bas di atas Plot E, di Zon 6 Bandar Meru Raya, Mukim untuk: Tetuan Animation Theme Park Sdn. Bhd. (Service Bridge))
2015
Completed Project
Malaysia
4.660873N; 101.08404E
16m long single span service bridge, come with UHPC Composite Bridge System
7 pieces of DURA® IB650-16m
In-situ RC pile cap and 300mm dia. spun pile (Class B)
Animation Theme Park Sdn. Bhd.
The Sanderson Design Group (Malaysia) Sdn. Bhd.

Jurutera Perunding Concrete Technology (Alternative Design)
Maltecon Builder Sdn. Bhd.
12 months
Completed