To Construct a Viaduct and Other Related Works at Section 49, Freeway 4 (KM157 Gerik-Kota Bahru), Corridor Ecology of Central Forest Spine (CFS), Gerik, Perak D.R. (Membina dan Menyiapkan 'Viaduct' dan Lain-Lain Kerja Yang Berkaitan Di Seksyen 49, Laluan 4 (KM 157 Gerik-Kota Bahru), Koridor Ekologi Central Forest Spine (CFS), Gerik, Perak Darul Ridzuan.)
2015
Completed Project
Malaysia
5.586919N, 101.477091 E
Five span 40m x 17.4m wide UHPC composite bridge, total length of 200m.
15 pieces of DURA® UBG2000-39.5m
300mm diameter micropiles
Jabatan Perhutanan Semenanjung Malaysia

JPS and JPS Perak

Perunding HJRS Sdn Bhd

Empayar Kukuh Sdn Bhd
18 months
Completed