
To Construct a New Bridge at Kampung Batu Papan, Gua Musang, Kelantan.(Membina Jambatan Baru di Kampung Batu Papan, Gua Musang, Kelantan)
2017
Completed Project
Malaysia
4.845174 N , 101.946527 E
Single Span 42m by 4m Wide Composite Bridge System.
1 piece of DURA® UBG1750-42m with Cast In-Situ RC Deck
Cast in-situ RC abutments
50mm dia. Spun pile (Class B)
HA+KEL or 30 units HB loadings
JKR, Malaysia

JKR Kesedar

JKR Kelantan

Zamri Bin Zakaria
Completed