
Menggantikan Jambatan di Atas Sg. Kinta, Kampung Paloh, Mukim Ipoh, Daerah Kinta, Perak D.R.(To Replace the Existing Bridge Crossing Kinta River, Kampung Paloh, Mukim Ipoh, Kinta District, Perak D.R.)
2018
Completed Project
Malaysia
4.590579N, 101.075945 E
Single Span 55m by 25m wide UHPC Composite Bridge System.
10 pieces of DURA® UBG2000-55m
2 nos. of cast in-situ RC abutments
300mm dia. micropiles
HA + KEL Loading + 45 Units HB Loadings (BD37/01)
Kerajaan Negeri Perak / JKR Perak

Perunding Warisan

Sanjung Sempurna S/B (G7)
24 months
Completed