
To Construct Bridge at Kampung Parit Markom, Pontian, Johor.(Membina Jambatan Baru Di Kampung Parit Markom, Mukim Sungai Pinggan, Pontian, Johor)
2019
Completed Project
Malaysia
1.697692 N, 103.315407 E
Single Span 52m by 5m Wide Composite Bridge System.
1 piece of DURA® UBG2000-52m with Cast In-Situ RC Deck
Cast in-situ RC abutments
450mm Diameter Spun Pile (Class B, Grade 80)
Combination HA + 30HB Unit
JPS Malaysia
N/A
Glorius Trading
Completed