
Project Road to Mesej Tabatu, Paitan, Sabah(Projek Jalan Ke Mesej Tabatu, Paitan, Sabah)
2020
Completed Project
Malaysia
6.368485 N, 117.372136 E
Single Span 55m by 8.9m Wide UHPFRC integral beam-deck system.
2 pieces of DURA® UBG2000-55m
Cast in-situ RC abutments
300mm dia. Micropiles
HA + 45 units HB loadings (BD37/01)
JKR Sabah
JKR Sabah
JPCT
COPROLECH SDN BHD
24 months
Completed