
To Replace Bridge at Sungai Rambai Kecil FT 005/413/50 Bridge Kuala Langat, Selangor Darul Ehsan.(Projek Menggantikan Jambatan FT 005/413/50 Jambatan Sungai Rambai Kecil Kuala Langat, Selangor Darul Ehsan)
2020
Completed Project
Malaysia
2.891132 N; 101.484224 E
Single Span 15.6m long by 21.1m Wide Composite Bridge System.
14 pieces of DURA® IB650-15.55m integral with Precast RC Deck
Existing RC Abutments
Combination of HA+KEL and 45 units HB loadings (BD37/01)
JKR Malaysia

JKR Kuala Langat

EDS Communication Sdn Bhd
JKR Malaysia
1 year
Completed