Construction of Ten (10) UHPC Footbridges Using Pi-Section Beam on the Rapid Reconstruction Project of Furong Avenue (XiangTan Section) (芙蓉大道快速化改造工程(湘潭段).
2020
Completed Project
China
(K18+749.09, FootBr.1) 27.954852°N, 113.017999°E. (K19+186.441, FootBr.2) 27.950881°N, 113.018155°E. (K20+204.069, FootBr.3) 27.940467°N, 113.017803°E. (K21+184.276, FootBr.4) 27.935273°N, 113.019184°E. (K23+030.263, FootBr.5) 27.918009°N, 113.015757°E. (K24+189.313, FootBr.6) 27.908177°N, 113.011438°E. (K24+748.966, FootBr.7) 27.903086°N, 113.009185°E. (K25+208.751, FootBr.8) 27.899175°N, 113.006498°E. (K25+440, FootBr.9) 27.897202°N, 113.002952°E. (K27+484.306, FootBr.12) 27. 887587°N, 112.988154°E.
FootBr.1, 3, 4, 5, 6, 7, 8, 10: 32m + 32m; FootBr.2: 30.5m +32 m; FootBr.9: 13.75m + 34.75m + 15.5m.
Twenty-One (21) pcs ZL-DURA π BEAM1600 c/w 20-35 mm thk. Cement Mortar Topping and 30mm Fire Surface Anti-Slip Granite Rock Plate Layer
RCC Piers
T.B.A
T.B.A
Hunan Communications & Water Conservancy Group Ltd.(湖南交通水利建设集团有限公司)
Hunan Communications Planning Survey and Design Institute Co., Ltd. (湖南省交通规划勘察设计院有限公司)
ZhongLu-Dura International Engineering Limited by Share Ltd.(中路杜拉国际工程股份有限公司)
Two Months
Completed