
Haixin Footbridge – 1st Application of UHPC on footbridge across the Pearl River in Guangzhou (海心桥 - 广州首座跨珠江人行桥上的应用)
2021
Completed Project
China
23.032546°N, 113.37942°E
198m long Arch Steel-UHPC composite at the Splashing Zone Only
Steel Box Girder decked with 25mm thk. UHPFRC Overlay
T.B.C
Guangzhou Urban Construction Investment Group Co., Ltd. (广州市城市建设投资集团有限公司)
South China University of Technology Architectural Design and Research Institute / Guangzhou Municipal Engineering Design and Research Institute Co., Ltd. 华南理工大学建筑设计院何镜堂工作 / 广州市市政工程设计研究总院有限公司
China Railway Guangzhou Engineering Bureau Group Co., Ltd. / ZhongLu Dura International Engineering Limited by Share Ltd.(中铁广州工程局集团有限公司 / 中路杜拉国际工程股份有限公司)
Completed