
PEMBINAAN JAMBATAN UNTUK AIR PIPE MENYEBERANGI SUNGAI DAN KERJA-KERJA UNTUK PACKAGE 1 (CH+800 TO CH29+800) UNTUK BEKALAN AIR DARI KEMAMAN, TERENGGANU TO GEBENG, PAHANG UNTUL EAST COAST ECONOMIC REGION DEVELOPMENT CONCIL (ECERDC) – SG. CHERATING (THE PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 (CH8+000 TO CH29+800) FOR PIPELINE, BOOSTER PUMP STATION AND ASSOCIATED WORKS FOR THE WATER SUPPLY PROJECT FROM KEMAMAN, TERENGGANU TO GEBENG, PAHANG FOR THE EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC).)
2023
Completed Project
Malaysia
4.133361 N, 103.371913 E
Single Span 38m by 2.6m (Avg.) Wide Composite Bridge System For Water Pipe Crossing.
1 pieces of DURA® UBG1250-38m with Cast In-Situ RC Deck
Cast in-situ RC abutments
300mm dia. Spun Piles (Class B)
Water Pipe Load + 3 kPa Maintenance Load
Pengurusan Air Pahang Berhad
KLCC Projeks Sdn Bhd
HLA Associates Sdn Bhd
Leika Sdn Bhd