Setiawangsa - Pantai Expressway (SPE) - DUKE Phase 3, Section 2 (Pier P21 – P50)
2021
Completed Project
Malaysia
3.130406 N; 101.718122 E (55.6m ML/P49 – ML/P50); 3.126035 N; 101.715160 E (63.2m ML/P32 – ML/P33); 3.123310 N; 101.713464 E (59.1m ML/P23 – ML/P24); 3.122491 N; 101.712953 E (59.1m ML/P21 – ML/P22)
Total Eight Spans of PT Segmental UHPC U-Girder Composite Bridge System.
Total 18 pieces of DURA® UBG2500 – 55.5m – 59.1m and 6 pieces of DURA® UBG3000 – 63.2m (Av.) with Cast In-Situ RC Deck
Cast in-situ RC piers
1.2m Dia. Bored Piles
HA+ 45 units HB loadings (BD37/01)
Lembaga Lebuhraya Malaysia (LLM)

Lembaga Lebuhraya Malaysia (LLM)
EDP Consulting Group Sdn Bhd
Ekovest Construction Sdn Bhd / Azutama