Project StatusAll ProjectsCompleted(237)On Going(56)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(235)Others(8)Select Years All2025 (54)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Upgrade Old Bridge at Padang Halban,Kota Bahru,Kelantan using DURA®IB1200 – 30m lengthYear: 2025Status: On GoingCountry: Malaysia To Upgrade Old Bridge at Sg. Monsok, Tambunan, Sabah using DURA®UBG1750 – 40m lengthYear: 2025Status: On GoingCountry: Malaysia To Replace Old Bridge at St. Joseph, Sandakan, Sabah using DURA®IB650 – 15m lengthYear: 2025Status: On GoingCountry: Malaysia To Replace Old Bridge at Felda Titi,Jelebu,Negeri Sembilan using DURA®IB650 – 15m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct New Bridge at Kampung Bahagia ,Teluk Intan, Perak using DURA® UBG2500 – 60m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct a Bridge at Kg.Tinanduk, Nabawan,Sabah using DURA®IB1000 – 24m and DURA®IB1300 – 30m lengthYear: 2025Status: On GoingCountry: Malaysia To Replace Old Bridges at Sungai Chandon and Sungai Mengkuang,Bera,Pahang Using DURA®IB650 – 18m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct 2 New Bridges at Jalan Pandan Indah and Jalan Pandan Mewah,Ampang, Selangor Using DURA® IB1000 – 29.5m and DURA® IB650 – 13.75m lengthYear: 2025Status: On GoingCountry: Malaysia To Replace Old Bridge at Kampung Padang Setol,Padang Terap,Kedah Using DURA®UBG1250 – 35m, DURA®IB850 – 15m and DURA®IB850 – 25m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct Linkway Bridge for Kuala Kedah Jetty, Kedah using DURA®IB1200-21.1m lengthYear: 2025Status: On GoingCountry: Malaysia Previous Page1 Page2 Page3 … Page6 Next