4-LANING OF EXISTING 2-LANING STRETCH FROM DHARMAPURI AT KM. 117.000 TO LONAND - AT KM. 166.400 (PKG-IV) ON MOHOL-ALANDI SECTION (DESIGN LENGTH 49.400 KM) OF NH-965 IN THE STATE OF MAHARASHTRA ON EPC MODE
2023
Completed Project
India
18.0104485 N, 74.4238111 E
Major Bridge UHPFRC Beam Composite in Situ Deck Bridge System – 3 Span x 35 m Length. Total length 105m
Simply Supported Twelve (12) UHPFRC BT1500 Girders for each span
RC Open Foundation
Twelve Pier for Each Foundation
IRC Class Loadings
National Highways Authority of India
Valecha-SDPL JV, Ayoleeza Consultants Pvt. Ltd.
Shirish Patel and Associates
VIJAY NIRMAN COMPANY - R.K. CHAVAN INFRASTRUCTURE PVT. LTD. (JV)
1 Years
Shinde Developers Pvt. Ltd.
Indian Institute of Science (IISC), Bangalore