(MENAIKTARAF JAMBATAN KG. SABAK, PENGKALAN CHEPA, KELANTAN)
2023
Completed Project
Malaysia
6.174076 N, 102.325228 E
Five Spans 120m by 11m Wide UHPFRC Composite Bridge System
35 pieces of DURA® IB850 – 24m
Cast in-situ RC abutments
1000mm dia. Bored Piles
HA+ 45 units HB loadings (BD37/01)
Jabatan Kerja Raya Malaysia

JKR Jajahan Kota Bharu

Mahsari Construction Sdn Bhd
24 Months