
Design and Construction of Coastal Road from Amra Marg to MTHL Junction (from Ch 00 at Amra Marg to Ch 2900) Including Airport Link Road (From Ch 00 to Ch 903) at Navi Mumbai
2025
On Going Project
India
18.984678 N ,73.079114 E
FOB-Spans Length: 40m,Spans Length: 38.5m , LP27-LP28 38.5m RP27-RP28 33m .
UHPFRC Girders with Deck Slab
IRC Loading
Long Span Structures Pvt. Ltd.
JM Mhatre
I.I.T. BOMBAY