PERLAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH – WP07 : MEMBINA JALAN DARI INANAM KE SEPANGGAR , SABAH.
2025
On Going Project
Malaysia
6.052854 N , 116.169976 E
One Span 33m by 11.9m Wide UHPFRC Composite Bridge System ( Bridge 1) , Two Spans 59m by 11.9m Wide UHPFRC Composite Bridge System (Bridge 2)
6 pieces of DURA® IB1300 – 33m , 6 pieces of DURA® IB1300 – 35m , 6 pieces of DURA® IB1200 – 24m
Cast in-situ RC abutments
1200mm dia. Bored Piles
HA+ 45 units HB loadings (BD 37/01)
Jabatan Kerja Raya Sabah
Cawangan Pembinaan & Pemantauan Sabah
Perwira Progresif Construction Sdn. Bhd.
36 Months