PROJECT PEMBINAAN BARU JAMBATAN DI KAMPUNG AIR PULAU, LAWIN, HULU PERAK, PERAK.
2025
On Going Project
Malaysia
5.315110 N , 101.053749 E
One Span 29.2m by 7.5m Wide UHPFRC Composite Bridge System
4 pieces of DURA®IB1200 – 29.2m
Cast in-situ RC abutments
300mm dia. Micropile
HA+ 45 units HB loadings (BD 37/01)
Kementerian Kemajuan Desa dan Wilayah
Jabatan Pengairan dan Saliran Negeri Perak

Jurutera Perunding Warisan
Gemilang Aisy Sdn Bhd
18 months