
MENGGANTIKAN JAMBATAN USANG KAMPUNG PADANG SETOL, PADANG TERAP,KEDAH
2025
On Going Project
Malaysia
6.2384167 N ,100.6804444 E
Three Spans 75.6m by 4.5m Wide UHPFRC Composite Bridge System
3 pieces DURA® IB850 – 25m, 1 piece of DURA® UBG1250 – 35m, 3 pieces of DURA® IB850 – 15m
Cast in-situ RC abutments
300mm dia. Micro Piles
HA+ 45 units HB loadings (BD37/01)
Jabatan Kerja Raya Malaysia
Jurutera Daerah JKR Padang Terap
Generasi Kedua Fst Holding Sdn Bhd
24 months