Proposed Construction And Completion of The Sarawak Second Trunk Road - Package A2: Proposed Construction Of Highway From Batang Sadong To Sebuyau, Samarahan Division, Sarawak
2024
On Going Project
Malaysia
1.4847244934799027, 110.95925489814984
Four Spans 160m by 12.4m wide UHPFRC Composite Bridge System
3 Pieces of DURA®UBG2500 – 60m 6 Pieces of DURA®BT1300 – 29.15m 12 Pieces of DURA®BT1300 – 34.325m
Cast in-situ RC abutments
800mm dia. Spun Piles
HA+ 45 units HB loadings
Jabatan Kerja Raya Sarawak

Jurutera TCS Sdn Bhd
Sri Datai Construction Sdn. Bhd