Guangdong Old Bridge Reconstruction Project (广东省旧桥改造项目) Part 3 (下埔径口桥)
2020
Completed Project
China
23.891351 N, 116.688291 E
Four spans simply supported 12m (2 spans) and 15m (2 spans) by 6.6m wide UHPC composite bridge system
Five (5) pieces per span of precast/prestress UHPC I-beam composited with reinforced NSC deck (total 20 pcs UHPC I-beam)
Cast in-situ RC piers
Existing Remained
First class load of highway 公路桥涵设计通用规范 (JTG D60-2015)
广东省基础工程集团有限公司 (Guangdong Foundation Engineering Group Co, Ltd.)
中铁二院工程集团有限责任公司 (CREC, China Railway Engineering Corporation)
广东华隧建设集团股份有限公司 (Guangdong Hua Tunnel Construction Group Co. Ltd)
Completed