DHARAMPURI 129+506 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.
2024
Completed Project
India
17.962716 N , 74.561937 E
UHPFRC Beam Composite in Situ Deck Bridge System – 1 No of 35m Length
RCC Deck + 5 nos. of BT1500 Girders on LHS and RHS Side.
Superstructure resting on Pile Cap
Pile and Pile Cap.
3 Lane Loading Combinations as per IRC-6:2017 (70R + Class A)
NHAI
RK Chavan Infrastructures Pvt. Ltd.
SDPL
Aerotide Infrastructure Engineering Pvt. Ltd