DHARAMPURI 141+350 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.
2024
On Going Project
India
17.962716 N , 74.561937 E
UHPFRC Beam Composite in Situ Deck Bridge System – 2 No of 31.95 m Length Integral Bridge
RCC Deck + 4 nos. of BT1500 Girders on LHS and RHS Side. Integral Bridge
Pier Type Abutment and Piers
Pile and Pile Cap.
3 Lane Loading Combinations as per IRC-6:2017 (70R + Class A)
NHAI
SDPL
Aerotide Infrastructure Engineering Pvt. Ltd.