Dharampuri Ch. 131+300 4-laning of existing 2-laning stretch from Dharmapuri at km. 117.000 το Lonand- at KM. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of NH-965 in the state of Maharashtra on EPC mode
2024
On Going Project
India
17.9807087 N , 74.5322525 E
UHPFRC Beam Composite in Situ Deck Bridge System – 1 No of 23 m Length Integral Bridge
RCC Deck + 6 nos. of IB850 Girders on LHS and RHS Side. Integral Bridge
Pier Type Abutment and Piers
Open Foundation
3 Lane Loading Combinations as per IRC-6:2017 (70R + Class A)
NHAI
RK Chavan Infrastructures Pvt. Ltd.
SDPL
Aerotide Infrastructure Engineering Pvt. Ltd.