Dharampuri Ch. 152+700 4-Laning of existing 2-laning stretch from Dharmapuri at KM 117.000 to Lonand- at km. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of nh-965 in the state of Maharashtra on EPC mode
2024
On Going Project
India
18.0029775 N , 74.3446135 E
UHPFRC beam composite in situ deck bridge system – 1 no of 33 m length integral bridge
RCC Deck + 3nos. of BT1500 Girders on LHS and RHS Side. Integral Bridge
Pier Type Abutment and Piers
Open Foundation
3 Lane Loading Combinations as per IRC-6:2017 (70R + Class A)
NHAI
RK Chavan Infrastructures Pvt. Ltd.
SDPL
Aerotide Infrastructure Engineering Pvt. Ltd.