
Kerja-Kerja Membina Dan Pencegah Banjir Sungai Ara Serta Kerja Kerja Lain Yang Berkaitan, Dearah Larut Matang Dan Selama, Perak Darul Ridzuan (Bridge 3 Sg. Ara CH 1250).
2014
Completed Project
Malaysia
5.013447 N , 100.739763 E
Single span 52m x 4.8m wide UHPdC U beam composite bridge
1 pieces of DURA® UBG1750-52m topped with 180mm thk in-situ RC deck slab
450mm dia. Spun Pile (Class B)
Full HA+30 unit HB loadings
JPS Perak

Dura Technology Sdn Bhd
JJM Sdn Bhd
Completed