Setiawangsa– Pantai Expressway (SPE) – DUKE Phase 3, Section 3 (Pier 105 to Pier 106) (P01-18-Sec3, Ramp 4)
2023
Completed Project
Malaysia
3.164775 N, 101.734981 E
Single Span 62m by 26.498m Wide Main line and 8.924m Wide Ramp 4 UHPC Composite Bridge System.
8 pieces of DURA® UBG2500 - 62m with Cast In-Situ RC Deck
Cast in-situ RC piers
Bored Pile
HA+ 45 units HB loadings (BD37/01)
Lembaga Lebuhraya Malaysia (LLM)
Lembaga Lebuhraya Malaysia (LLM)
MMSB Consult Sdn Bhd
Pembinaan Jemerlang Sdn Bhd