To Build A New Bridge At Kampung Sepah Beruang Benut, Pontian, Johor (Membina Jambatan Baru Di Kampung Sepah Beruang Benut, Pontian, Johor)
2021
Completed Project
Malaysia
1.639795 N, 103.261916 E
Three Spans 63m by 5m Wide UHPFRC integral beam-deck system
6 pieces of DURA® IB850-20m and 3 pieces of DURA® IB850-23m
Cast in-situ RC abutments
600mm dia. Spun pile (Class B)
HA+ 30 units HB loadings (BD37/01)
JPS Malaysia
JPS Johor
JPCT
Kamy Sejahtera Enterprise