
Kerja-Kerja Menggantikan Jambatan Lama Kampung Ulu Kampar, Daerah Kampar, Perak.
2011
Completed Project
Malaysia
4.4474459 N ,101.2258615 E
Single span 18m x 3.5m (MTB-R1) UHPdC integral beam-deck system.
2 pieces of DURA® TBG1325-18m
Pad footing
Full HA+30HB loadings (BD37/01)
JKR Kinta (Perak)

TS Yee & Associates

Naza Tegoh Enterprise / Maltecon Builder S/B
2 months
4 months
Completed