PROJEK JALAN-JALAN UTAMA DI PULAU PINANG, PACKAGE 1: NORTH COASTAL PAIRED ROAD. PACKAGE 2: AYER ITAM – LEBUHRAYA TUN DR LIM CHONG EU BYPASS. PACKAGE 3: PERSIARAN GURNEY – LEBUHRAYA TUN DR LIM CHONG EU BYPASS
2024
On Going Project
Malaysia
5.372861 N, 100.307917 E
Four Spans 200m by 26.3m Wide UHPFRC Composite Bridge System
25 pieces of DURA® UBG2500 – 33m~58m & 4 pieces of DURA® UBG1750 – 25m
Cast in-situ RC abutments and Piers
800mm Spun Piles
HA+ 45 units HB loadings (BD37/01)
Pejabat Setiausaha Kerajaan Negeri Pulau Pinang (BPEN)
PL & Associates Sdn Bhd
Consortium Zenith Construction Sdn Bhd
24 Months