To Rebuilding Parit Besat Bakong, Agricultural Drainage Plan, Changkat Cermin, Mukim Bota, Perak Tengah District, Perak D.R.(Membina Semula Parit Besat Bakong, Rancangan Saliran Pertanian, Changkat Cermin, Mukim Bota, Daerah Perak Tengah, Perak D.R.)
2016
Completed Project
Malaysia
4.333279N; 100.860325E
Single Span 35m x 6.5m Wide Composite Bridge System.
2 pieces of DURA® UBG1250-35m, with Cast In-Situ RC Deck
Cast in-situ RC abutments
250mm RC Square Piles
HA+KEL Only (BD37/01)
JPS Perak

Jurutera Perunding Concrete Technology
Wangsa Wawasan
4 months
Completed