Construction of Seven (7) UHPC Footbridges Using Pi-Section Beam on the Rapid Reconstruction Project of Tanzhou Avenue (XiangTan Section)(潭州大道快速化改造工程(湘潭段), 人行天桥
2020
Completed Project
China
(K6+780, FootBr.3) 27.959768°N, 112.953331°E. (K8+036, FootBr.4) 27.948407°N, 112.952135°E. (K9+250, FootBr.5) 27.937523°N, 112.952802°E. (K10+670, FootBr.6) 27.924820°N, 112.954476°E. (K12+073, FootBr.7) 27.914430°N, 112.949017°E. (K13+100, FootBr.8) 27.904901°N, 112.948327°E. (K14+068, FootBr.9) 27.895293°N, 112.947569°E.
FootBr.3: 13.1m + 34m + 13.1m; FootBr.4: 9.7m + 34m + 9.7m; FootBr.5: 15m + 30.4m +18.8 m; FootBr.6: 23.3m + 26.6m + 21.6m; FootBr.7: 15.8m + 32m + 19.5 m; FootBr.8: 10.5m + 34m + 10.5 m; FootBr.9: 10.2m + 32.8m + 11.7m.
Twenty-One (21) pcs ZL-DURA π BEAM1600 c/w 20-35 mm thk. Cement Mortar Topping and 30mm Fire Surface Anti-Slip Granite Rock Plate Layer
RCC Piers
T.B.A
T.B.A
Hunan Communications & Water Conservancy Group Ltd.(湖南交通水利建设集团有限公司)
Hunan Communications Planning Survey and Design Institute Co., Ltd. (湖南省交通规划勘察设计院有限公司)
ZhongLu-Dura International Engineering Limited by Share Ltd. (中路杜拉国际工程股份有限公司)
T.B.A
Completed