To Construct New Bridge at Kampung Rancangan Merah, Lenggong, Perak D.R.(Membina Jambatan Baru Di Kampung Rancangan Merah, Lenggong, Perak Darul Ridzuan.)
2017
Completed Project
Malaysia
5.222522 N, 101.071337 E
Single Span 42m by 4m Wide Composite Bridge System.
1 piece of DURA® UBG1750-42m with Cast In-Situ RC Deck
Cast in-situ RC abutments
200 x 200 mm RC pile
HA+KEL or 30 units HB loadings
Pejabat Daerah dan Tanah Hulu Perak
Pejabat Daerah dan Tanah Hulu Perak
Jurutera Perunding Technology
Dura Technology S/B
Completed