Interchange 3 - Pandan - Duke Phase 3, Section 2 (Salak - Pandan), Construction & Completion of Bridge Structure Works for Pandan Interchange (Ramp 3A Only)
2021
Completed Project
Malaysia
3.138564°N, 101.721205°E (61.5m Ramp R3A/P7 – R3D/P4); 3.138622°N, 101.720946°E (70m Ramp R3A/P7 – R3A/P8); 3.138693°N, 101.720534°E (61.8m Ramp R3A/P8 – R3A/P9)
Three Spans UHPC PT U-Girder with Composite Bridge System.
Total 3 pieces of DURA® UBG2500 – 60.2m – 61.7m and 2 pieces of DURA® UBG3000 – 69.8m with Cast In-Situ RC Deck
Cast in-situ RC piers
1.2m Dia. Bored Piles
HA+ 45 units HB loadings (BD37/01)
Lembaga Lebuhraya Malaysia (LLM)
Lembaga Lebuhraya Malaysia (LLM)
EDP Consulting Group Sdn Bhd
Ekovest Construction Sdn Bhd / Pembinaan Jemerlang Sdn Bhd