
To Construct Jalan Terengganu By-Pass, Kuala Terengganu, Terengganu Darul Iman for the KT-By Pass Project (Bridge ST2).(Membina dan Menyiapkan Jalan Terengganu By-Pass, Kuala Terengganu, Terengganu Darul Iman)
2017
Completed Project
Malaysia
5.290302 N, 103.134801 E
Single Span 35m by 11.5m Wide (Left & Right) Composite Bridge System (Skew 15 degree).
4 pieces of DURA® UBG2000-35m with Cast In-Situ RC Deck
Cast in-situ RC abutments
500mm dia. Spun pile (Class B)
HA+KEL or 45 units HB loadings (BD37/01)
JKR Malaysia

JKR Terengganu

Jannacks Consultants Sdn Bhd
Iswarabena Sdn Bhd Sdn Bhd (G7)
36 months
Completed