To Construct Jalan Terengganu By-Pass, Kuala Terengganu, Terengganu Darul Iman (Bridge ST3)(Membina dan Menyiapkan Jalan Terengganu By-Pass, Kuala Terengganu, Terengganu Darul Iman) (Jambatan ST3)
2019
Completed Project
Malaysia
5.304631 N, 103.124018 E
Five Spans 38m by 11.5m Wide (Left & Right) Composite Bridge System.
20 pieces of DURA® UBG2000-38m with Cast In-Situ RC Deck
Cast in-situ RC abutments and piers
500mm dia. Spun pile (Class B)
Combination of HA+KEL or 45 units HB loadings (BD37/01)
JKR Malaysia

JKR Terengganu

Jannacks Consultants Sdn Bhd
Iswarabena Sdn Bhd Sdn Bhd (G7)
Completed