To Build A New Bridge At Jalan Pasir Tumboh / Wakaf Che Yeh, Kota Bharu, Bharu, (Sg. Mulong)(Cadangan Pembinaan Jambatan Baru Di Jalan Pasir Tumboh / Wakaf Che Yeh, Kota Bharu, Kelantan) (Sg. Mulong)
2020
Completed Project
Malaysia
6.056278 N; 102.278867 E
Three Spans UHPFRC Beam Composite In Situ Deck Bridge System: 44.78m x 7.9m wide.
15 pieces of DURA® IB650-12m with Cast In-Situ RC Deck
2 nos. of Cast in-situ RC abutments & 2 nos. of Cast in-situ RC Piers
450mm Spun Pile (Class C)
HA+KEL or 45 units HB loadings
JKR Kelantan

JKR Kelantan

Global Niche Consultant
K.A.Z Trading (M) Sdn Bhd
Completed