To Comstruct a Pedestrian Bridge at the Animination Theme Park at Ipoh. (Membina 1 Unit Bangunan Pintu Masuk Satu (1) Tingkat, 1 Unit TNB Substation 11/0.4kV, 6 Unit ‘Drop off’’ Berbumbung, unit Pintu Gerbang, 634 unit Tempat Kereta, 92 unit Tempat Letak Motosikal, 16 unit Tempat Letak Bas di atas Plot E, di Zon 6 Bandar Meru Raya, Mukim untuk: Tetuan Animation Theme Park Sdn. Bhd. (Pedestrian Bridge))
2015
Completed Project
Malaysia
4.663077N; 101.08444E
120m long multiple span pedestrian bridge, come with UHPC Composite Bridge System
24 pieces of DURA® IB650-19.5m
In-situ RC pile cap and 500mm dia. spun pile (Class C)
Animation Theme Park Sdn. Bhd.
The Sanderson Design Group (Malaysia) Sdn. Bhd.

Jurutera Perunding Concrete Technology (Alternative Design)
Maltecon Builder Sdn. Bhd.
12 months
Completed