To Construct the First DURA Bridge at Kampot, Cambodia
2019
Completed Project
Others
10.654308,104.557209
Single Span 26m long by 8.9m Wide Composite Bridge System.
2 pieces of DURA® UBG1500-26m with Cast In-Situ RC Deck
Cast in-situ RC abutments
300 x 300mm dia. SQ RC. pile (Class B)
Combination of HA+KEL and 45 units HB loadings (BD37/01)
Kampot Cement Co.,Ltd. Cambodia
SCG Group Team
Construction Solution, The Concrete Products and Aggregate Co.,Ltd.
Handan (Cambodia) Construction Co., Ltd
1st July – 30th December 2019
Completed