Extension and Reconstruction of Huadu Avenue (North Approach Junction of Airport to Cotton Tree Drive). 花都大道(机场北进路口至红棉大道段)扩建改造工程
2019
Completed Project
China
23.435640 N; 113.301292 E
Double Span 30m by 5.3m wide Double T-UHPC Bridge Girder
2 pieces of Double Tee- Integral Beam-Deck Bridge
Cast in-situ RC piers
1m dia. Bored piles
5 kPa
广州市花都区地方公路管理站 Guangzhou Huada District Local Highway Management Station
广州市公路勘察设计有限公司 Guangzhou Highway Survey and design Co. Ltd
广东华隧建设集团股份有限公司 Guangdong Hua Tunnel Construction Group Co. Ltd
Completed