RAPID TRANSIT SYSTEM LINK (RTS LINK) PROJECT BETWEEN JOHOR BAHRU AND SINGAPORE- Package 5 Terrestrial Viaduct (Pier 1 – Pier 1b)
2023
Completed Project
Malaysia
1.468844 N, 103.760880 E
Single Span 80.411m by 14.3m to 17.64m Wide Composite Bridge System.
4 pieces of DURA® UBG4000-80.411m, with Cast In-Situ RC Deck
Cast in-situ RC piers & portal
1.8m Dia. Bored Piles
Railway Loading
Mass Rapid Transit System (MRTS)
Mass Rapid Transit System (MRTS)
AECOM Perunding Sdn Bhd
Sunway Construction Sdn Bhd
SA Architects Sdn Bhd