REKA BENTUK DAN DIBINA UNTUK PEMBETULAN KEKAL JAMBTAN KERETAPI TANAH MELAYU BERHAD (KTMB) DI ATAS LEBUHHRAYA (NKVE) DI KM 11.25 SEMPADAN TIMUR DI SEKSYEN C4(Design and Built for permanent rectification of Keretapi Tanah Melayu Berhad’s (KTMB) bridge over New Klang Valley Expressway (NKVE) at KM 11.25 East Bound in Section C4)
2023
Completed Project
Malaysia
3.098421 N, 101.567234 E
Single Span 25.5m by 12mm Wide Composite Bridge System.
20 pieces of DURA® IB850-25.5m, with Cast In-Situ RC Deck
Cast in-situ RC piers
Original Foundation
Railway Loading
KTMB
PLUS HIGHWAY
K.L. CONSULT ASSOCIATES SDN BHD
Loyal Engineering Sdn Bhd