
PROJEK RANCANGAN TEBATAN BANJIR SUNGAI CHEMPEDAK, DAERAH JELEBU, NEGERI SEMBILAN
2025
On Going Project
Malaysia
Br. No.1,3&5 : 2.989265,102.085026, Br No.6 : 2.983248,102.072639
Bridge No.1,No.3 & No.5 Single Span 20m by 5m Wide UHPFRC Composite Bridge System | Bridge No.4 Single Span 21.5m by 5m Wide UHPFRC Composite Bridge System | Bridge No.6 Single Span 20m by 5m Wide UHPFRC Composite Bridge System | Bridge No.7 Single Span 20m by 7m Wide UHPFRC Composite Bridge System
Bridge 1,2,3 & 5 : 12 pieces of DURA®IB1000 – 20M | Bridge 4 : 3 pieces of DURA®IB1000 – 21.5M | Bridge 6 & 7 : 8 pieces of DURA®IB650 - 20M
Cast in-situ RC abutments
200mm x 200mm dia. RC Piles
HA+ 45 units HB loadings (BD37/01)
Jabatan Pengairan dan Saliran Malaysia
Jabatan Pengairan dan Saliran Negeri Sembilan
Arkisha Bina Enterprise
24 months